Cost to Build a Deck in Minneapolis, MN (2026)

    In Minneapolis a 12×16 ft deck costs about $4,880 in pressure-treated pine and $10,117 in composite, installed — 9% above the US average. Below: local prices by size, footing depth, permits and a calculator priced for Minneapolis.

    Pressure-treated pine

    $22–$28 /sq ft

    Cedar

    $31–$40 /sq ft

    Composite

    $46–$60 /sq ft

    Deck cost calculator for Minneapolis

    Priced with Minneapolis labour, material and footing-depth factors. Change any input and the estimate updates.

    Estimated installed cost

    $8,903 – $11,635

    192 sq ft · about $52.69/sq ft

    Materials
    $6,166
    Labour
    $3,952
    Footings (42 in deep)
    3 × about $224
    Frost-depth adjustment
    +$173

    Mid-range estimate for a rectangular deck attached to the house, with one beam line per 12 ft of depth and footings every 8 ft. Excludes demolition, permits and site work. For railing, stairs and a full line-item breakdown use the main deck cost calculator.

    Minneapolis deck cost by size and material

    Mid-range installed prices for a standard-height deck attached to the house, with footings at 42 inches. Add railing and stairs in the deck cost calculator.

    Installed deck cost in Minneapolis by size and material, mid-range, 2026
    Deck sizePressure-treated pineCedarComposite
    10 × 10 ft (100 sq ft)$2,624$3,672$5,352
    12 × 12 ft (144 sq ft)$3,703$5,212$7,631
    12 × 16 ft (192 sq ft)$4,880$6,892$10,117
    16 × 20 ft (320 sq ft)$8,306$11,659$17,035
    20 × 20 ft (400 sq ft)$10,268$14,459$21,178

    What makes a deck in Minneapolis cost what it does

    Deep frost, snow and a short building season.

    Labour here runs 5% above the Minnesota average, so a pressure-treated 12×16 that averages $4,832 across Minnesota comes to about $4,880 in Minneapolis. Some of the deepest frost in the lower 48, heavy snow and hot, humid summers.

    Footings

    Footings in Minneapolis go about 42 inches deep, which costs roughly $224 per 12 inch footing installed. A 12×16 deck needs about 3. Size them with the deck footing calculator.

    Deck permits in Minneapolis

    Permits are issued by the Minneapolis Development Review. Footings go 42 inches deep, and attached decks need a permit regardless of height. Typical fees run $150–$500. For the state rules that sit behind the local ones, see deck cost in Minnesota.

    Choosing decking in Minneapolis

    Composite adds about $5,237 to a 12×16 deck here over pressure-treated. Higher labour costs and a harsh freeze-thaw cycle favour boards that need no refinishing. Run the numbers for your deck in the composite vs wood calculator.

    Best time to build

    May to October.

    Frequently asked questions

    How much does a deck cost in Minneapolis?

    A 12×16 ft deck in Minneapolis costs about $4,880 in pressure-treated pine, $6,892 in cedar and $10,117 in composite, installed. That is $22–$28 per square foot for pressure-treated and $46–$60 for composite.

    Is building a deck in Minneapolis more expensive than elsewhere in Minnesota?

    A typical deck in Minneapolis runs right in line with the Minnesota average and 9% above the US average, mainly because of local labour rates. Deep frost, snow and a short building season.

    Do I need a permit for a deck in Minneapolis?

    Permits are issued by the Minneapolis Development Review. Footings go 42 inches deep, and attached decks need a permit regardless of height. Budget roughly $150–$500 for the permit, more if drawings by a design professional are required.

    How deep do deck footings have to be in Minneapolis?

    About 42 inches. Each 12 inch footing at that depth costs roughly $224 installed, and a 12×16 deck needs about 3. Always confirm the required depth with the Minneapolis Development Review before digging — the footing inspection happens before any concrete goes in.

    Should I choose composite or wood for a deck in Minneapolis?

    Composite adds about $5,237 to a 12×16 deck in Minneapolis but removes staining every two to three years. Higher labour costs and a harsh freeze-thaw cycle favour boards that need no refinishing.

    Figures are planning estimates built from national installed prices adjusted for Minnesota and Minneapolis labour, materials and footing depth. Get two or three itemised local quotes. Method.